Catalog/Enerpac/Utilizing an innovative Accelerated Bridge Construction (ABC) method Kiewit, Jacobs Engineering and the Colorado Department of Transportation developed a plan to build the replacement bridge adjacent to the existing bridge.
Enerpac

Utilizing an innovative Accelerated Bridge Construction (ABC) method Kiewit, Jacobs Engineering and the Colorado Department of Transportation developed a plan to build the replacement bridge adjacent to the existing bridge.

SKU: jack-and-roll-system-pulls-the-fort-lyon-bridge-into-position

Our experts will contact you within 24 hours.

Product Description

Minimizing the amount of time state highway 266 was shut off to traffic was a primary objective during the reconstruction of the bridge over Fort Lyon Canal. Utilizing an innovative Accelerated Bridge Construction (ABC) method Kiewit, Jacobs Engineering and the Colorado Department of Transportation developed a plan to build the replacement bridge adjacent to the existing bridge. The new bridge was initially used as a detour while the deficient bridge was demolished. Once demolished, the new bridge was then closed to traffic and needed to be pulled into the position of the original bridge.

Need technical consultation?

Our team of engineers is ready to help you choose the right product or design a custom solution for your specific needs.

Používáme cookies ke zlepšení Vašeho zážitku. Technicky nezbytné cookies jsou vždy aktivní. Více informací