Catalog/Enerpac/Building the cooling tower structure of the Medupi power station required bolting together hundreds of steel joints. Each bolt required the precise application to be torqued, which is both challenging and requires a significant amount of time with manual tools.
Enerpac

Building the cooling tower structure of the Medupi power station required bolting together hundreds of steel joints. Each bolt required the precise application to be torqued, which is both challenging and requires a significant amount of time with manual tools.

SKU: power-station-joint-assembly-with-hydraulic-torque-wrenches

Our experts will contact you within 24 hours.

Product Description

Building the cooling tower structure of the Medupi power station required bolting together hundreds of steel joints. Each bolt required the precise application to be torqued, which is both challenging and requires a significant amount of time with manual tools.

Need technical consultation?

Our team of engineers is ready to help you choose the right product or design a custom solution for your specific needs.

Používáme cookies ke zlepšení Vašeho zážitku. Technicky nezbytné cookies jsou vždy aktivní. Více informací