Catalog/Enerpac/ALE Heavy Lift was tasked with skidding an 800 ton railway bridge over a highway using skidding equipment and steel strands. The steel strands were used as diagonals within the skidding towers and as a connection in a longitudinal direction between the skidding supports. Before the bridge could be skided onto the towers, more than 20 cable strands had to be pre-loaded to the same tension.
Enerpac
ALE Heavy Lift was tasked with skidding an 800 ton railway bridge over a highway using skidding equipment and steel strands. The steel strands were used as diagonals within the skidding towers and as a connection in a longitudinal direction between the skidding supports. Before the bridge could be skided onto the towers, more than 20 cable strands had to be pre-loaded to the same tension.
SKU: pre-loading-bridge-cables-with-a-battery-powered-hydraulic-pump
Our experts will contact you within 24 hours.
Product Description
ALE Heavy Lift was tasked with skidding an 800 ton railway bridge over a highway using skidding equipment and steel strands. The steel strands were used as diagonals within the skidding towers and as a connection in a longitudinal direction between the skidding supports. Before the bridge could be skided onto the towers, more than 20 cable strands had to be pre-loaded to the same tension.
Need technical consultation?
Our team of engineers is ready to help you choose the right product or design a custom solution for your specific needs.