Catalog/Enerpac/Çal?k Enerji is constructing a new simple-cycle power plant with a 542 megawatt capacity in Khoms, Libya. The Sarilar Group was tasked with installing a GE gas turbine weighing approximately 280 tons and a GE generator weighing approximately 214 tons.
Enerpac

Çal?k Enerji is constructing a new simple-cycle power plant with a 542 megawatt capacity in Khoms, Libya. The Sarilar Group was tasked with installing a GE gas turbine weighing approximately 280 tons and a GE generator weighing approximately 214 tons.

SKU: turbine-and-generator-installation-at-a-new-power-plant-in-libya

Our experts will contact you within 24 hours.

Product Description

Çal?k Enerji is constructing a new simple-cycle power plant with a 542 megawatt capacity in Khoms, Libya. The Sarilar Group was tasked with installing a GE gas turbine weighing approximately 280 tons and a GE generator weighing approximately 214 tons. Installation required lifting the turbine and generator over 5 meters high and lowering into position on a concrete foundation.

Need technical consultation?

Our team of engineers is ready to help you choose the right product or design a custom solution for your specific needs.

Používáme cookies ke zlepšení Vašeho zážitku. Technicky nezbytné cookies jsou vždy aktivní. Více informací