Catalog/Enerpac/A Siemens gas turbine arrived at the Samsun Sea Port destine for a new 600MW natural gas combined cycle power plant in Samsun, Turkey. The 482 ton turbine needed to be lifted and loaded onto a SPMT in order to be transported to the Cengiz Enerji power plant.
Enerpac

A Siemens gas turbine arrived at the Samsun Sea Port destine for a new 600MW natural gas combined cycle power plant in Samsun, Turkey. The 482 ton turbine needed to be lifted and loaded onto a SPMT in order to be transported to the Cengiz Enerji power plant.

SKU: turbine-lift-and-load-in-at-shipping-port

Our experts will contact you within 24 hours.

Product Description

A Siemens gas turbine arrived at the Samsun Sea Port destine for a new 600MW natural gas combined cycle power plant in Samsun, Turkey. The 482 ton turbine needed to be lifted and loaded onto a SPMT in order to be transported to the Cengiz Enerji power plant.

Need technical consultation?

Our team of engineers is ready to help you choose the right product or design a custom solution for your specific needs.

Používáme cookies ke zlepšení Vašeho zážitku. Technicky nezbytné cookies jsou vždy aktivní. Více informací